2005/2035 SERPM 6.5.2 Usability Enhancements (based on Cost Feasible Inputs Created on 02/01/2010)

Home / Model Download / Statewide and Regional Models / Southeast Florida Regional Planning Model (SERPM) / 2005/2035 SERPM 6.5.2 Usability Enhancements (based on Cost Feasible Inputs Created on 02/01/2010)

2005/2035 SERPM 6.5.2 Usability Enhancements (based on Cost Feasible Inputs Created on 02/01/2010)

Click a file below to download:

In order to improve the overall user experience applying the model for specific analyses, FDOT District 4 has consolidated the various versions of SERPM 6.5 into an enhanced single platform. Designated as version SERPM 6.5.2, please unzip the model and run the self installation executable following the user prompts for model location. Please click on the linked documentation for further details related to this model changes in this version. A summary of improvements are summarized below:

  • Incorporate and integrate the SERPM Time of Day model for three modes
    • With Subarea selection: Highway only assignment
    • Without Subarea selection: Highway only assignment
    • Without Subarea selection: Highway and Transit assignment
  • Reconfigure the SERPM user interface to support the application manager for the three modes listed above.
  • Review and Modify SERPM to incorporate window reporting HEVAL that includes LOS reporting thresholds.
  • Incorporate network updates per the direction of Miami-Dade MPO.

By Haifeng Wang
Mailing List Signup
// var _gaq = _gaq || []; // _gaq.push(['_setAccount', 'UA-17007970-1']); // _gaq.push(['_trackPageview']); // (function() { // var ga = document.createElement('script'); ga.type = 'text/javascript'; ga.async = true; // ga.src = ('https:' == document.location.protocol ? 'https://ssl' : 'http://www') + '.google-analytics.com/ga.js'; // var s = document.getElementsByTagName('script')[0]; s.parentNode.insertBefore(ga, s); // })();
FSUTMS Online
Model Task Force Logo