Treasure Coast Regional Planning Model (TCRPM) / Statewide and Regional Models

Home / Model Download / Statewide and Regional Models / Treasure Coast Regional Planning Model (TCRPM)

Treasure Coast Regional Planning Model (TCRPM)

Welcome to the weblog for the Treasure Coast Regional Planning Model. We hope you will find the information you need about our model here. For additional information, please email .(JavaScript must be enabled to view this email address) at FDOT District 4.

Treasure Coast Regional Planning Model Version 5.1 (TCRPM5.1) *Current Adopted Model*

The Treasure Coast Regional Planning Model Version 5.1 (TCRPM 5.1) is the most recent, current officially adopted model. TCRPM was used in the 2045 LRTP adoptions by the Treasure Coast M/TPOs. The model features the base year of 2015 and the cost feasible forecast year of 2045. 

Read More

Treasure Coast Regional Planning Model Version 5.0 (TCRPM5)

The Treasure Coast Regional Planning Model Version 5 (TCRPM 5.0) is the most recent, current officially adopted, TCRPM model that was used in the 2045 LRTP adoptions by the Treasure Coast M/TPOs. The model features the base year of 2015 and the cost feasible forecast year of 2045. 

Read More

Public Use 2016 TC Florida Household Survey Dataset

Treasure Coast Florida conducted a household travel survey in 2016. The survey covered the region of Martin, St. Lucie, and Indian River Counties. 1,498 households and 3,073 persons reported their travel for one or two days. This dataset contains the characteristics of these sample households and persons and their travel activities. The sample data served as the groundwork to develop the parameters for the Treasure Coast Florida Regional Planning Model (TCRPM) Version 5.

Read More

2010/2040 Cost Feasible TCRPM 4.1 (Activity-Based Model)

This version is fully compatible with Cube 6.4.2 and includes CT-RAMP and input networks updates.

Read More

TCRPM4 Enhanced Documentation

This is a hyper-linked pdf of the TCRPM4 flowchart documentation.  This enhanced documentation is to provide enough detail on what is going on inside each of the scripts.  It is a balance between showing the procedures on one screen and providing detail.  It highlights the complexity of the model and exposes the reason why modelers have hard time to understand the modeling process.

TCRPM4 Enhanced Documentation.pdf

Read More

2010/2040 Cost Feasible TCRPM 4.0 (Activity-Based Model)

2010/2040 Cost Feasible TCRPM 4.0 model is available for download. Please check with T/MPOs and District 4 regarding the use of this model for projects.

Read More

2030 TCRPM III (Updated on 11/21/2008)

Read More

2030 TCRPM III (Updated on 10/16/2008)

Read More

TCRPM III Model Download (Created on 06/27/2007)

Read More
Mailing List Signup
// var _gaq = _gaq || []; // _gaq.push(['_setAccount', 'UA-17007970-1']); // _gaq.push(['_trackPageview']); // (function() { // var ga = document.createElement('script'); ga.type = 'text/javascript'; ga.async = true; // ga.src = ('https:' == document.location.protocol ? 'https://ssl' : 'http://www') + '.google-analytics.com/ga.js'; // var s = document.getElementsByTagName('script')[0]; s.parentNode.insertBefore(ga, s); // })();
FSUTMS Online
Model Task Force Logo