Posted Friday, August 09, 2019
Contains the Base Year 2010 and 2040 E+C and Cost Feasible scenarios. It also includes the output final highway trip table, loaded highway network and loaded transit network. This model is to be superseded by the 2045 Northwest Florida Regional Planning Model in October/November 2019.