District One Regional Model v2.1 - Interim Update

Home / Model Download / Statewide and Regional Models / D1 Regional Planning Model / District One Regional Model v2.1 - Interim Update

District One Regional Model v2.1 - Interim Update

The District One Regional Planning Model (D1RPM) version 2.1 (released on 6.19.23) is a Florida Standard Urban Transportation Model Structure (FSUTMS), four-step, trip-based model. Developed with CUBE/Voyager v6.4.2 transportation planning software. This model includes all of FDOT District One’s twelve counties: Charlotte, Collier, Desoto, Glades, Hardee, Hendry, Highlands, Lee, Manatee, Okeechobee, Polk, and Sarasota. A few traffic analysis zones (TAZs) in Osceola County near I-4 are also included.

The D1RPM v2.1 consists of a base year of 2015, existing plus committed (E+C) year of 2024, and forecast year of 2045. Some of the key model changes include:

  • Network revisions as requested by MPO/TPOs.
  • Revisions associated with various District PD&E studies performed.
  • Network revisions associated with updating the E+C year from 2023 to 2024.
  • Correction of any errors/discrepancies found.
  • Updated ZONEDATA to incorporate missing Mobile Home Park data.
  • 2045 ZONEDATA changes as requested by MPO/TPOs.
  • Hotel/Motel data revisions.
  • Various employment data revisions.
  • External station refinements (NE Polk) based on updated CFRPM7 model.

There is more detailed documentation of these and other changes included in the DOC model folder.

  • Model Version Number: 2.1
  • Date of Model Completion: 6/15/2023
  • Key Differences Compared to Previous Model Version: Interim model update -- Update E+C Network from 2023 to 2024. Revisions/corrections to SE data and network for 2015, 2024, and 2045, as documented in the DOC model folder.
  • Base Year (validation year of model): 2015
  • Horizon Year: 2045
  • Model Type: Four-step
  • Time of Day: Multiple periods
  • Description of Time Periods (if multiple periods): AM, MD, PM, NT
  • Software Version Used for Model Development: Cube version 6.4.2
  • Estimated Run Time (if extraordinary): 5 to 15 hours
  • Special Installation Instructions: Assigned volumes are in AADT. Links coded with LRTP_KEY=99 are deleted during Network step.

Click a file below to download:

By Terry Corkery
Mailing List Signup
// var _gaq = _gaq || []; // _gaq.push(['_setAccount', 'UA-17007970-1']); // _gaq.push(['_trackPageview']); // (function() { // var ga = document.createElement('script'); ga.type = 'text/javascript'; ga.async = true; // ga.src = ('https:' == document.location.protocol ? 'https://ssl' : 'http://www') + '.google-analytics.com/ga.js'; // var s = document.getElementsByTagName('script')[0]; s.parentNode.insertBefore(ga, s); // })();
FSUTMS Online
Model Task Force Logo